搜索结果: 1-1 共查到“防灾减灾工程及防护工程 Gated Spillways”相关记录1条 . 查询时间(0.14 秒)
Six-Stage Flood Routing for Dams Having Gated Spillways
Flood Routing Dams Gated Spillways
2009/10/14
A six-stage operation policy for the routing of flood hydrographs with return periods from 1.01 years up to the Probable Maximum Flood (PMF) is proposed for any dam having a gated spillway. The gate o...